1.1 In these Terms and Conditions, unless the context otherwise requires:
“JK CANNING ELECTRICAL SERVICES” means JK CANNING ELECTRICAL SERVICES ABN 73 634 185 176 (and includes its officers, employees, agents, subcontractors, successors and permitted assigns).
“Customer” means any person, company, partnership, trust, body corporate, government body or other legal entity that requests, orders, accepts, or is supplied with goods and/or services from JK CANNING ELECTRICAL SERVICES, and includes its agents, representatives, officeholders, trustees, beneficiaries, executors, administrators, liquidators, receivers, successors and permitted assigns. Where the Customer is acting as trustee of a trust, the Customer enters into this agreement in its own capacity and in its capacity as trustee of that trust.
“Goods” means all products, materials, components, parts, equipment or items supplied or to be supplied by JK CANNING ELECTRICAL SERVICES to the Customer, whether installed or uninstalled.
“Services” / “Works” means any labour, installation, testing, commissioning, maintenance, repairs, programming, integration, certification or other work performed by JK CANNING ELECTRICAL SERVICES.
“Quote” means any written or electronic quotation, estimate, proposal, schedule of rates or price indication provided by JK CANNING ELECTRICAL SERVICES, including any variation of same.
“Order” means any instruction, request, acceptance, booking or engagement by the Customer for the supply of goods and/or services, whether verbal, written, electronic, or implied by conduct.
“Variation” means any change to the scope of works, materials, method, design, timing, cost or assumptions on which the Quote was based, including latent conditions, site delays, obstructions, additional work required for safety or compliance, or Customer‑requested changes.
“PPSA” means the Personal Property Securities Act 2009 (Cth) and all related regulations and amendments.
“Completion” means the point at which the relevant works are practically completed, installed or supplied, whether or not final certification or documentation is pending due to portal, regulator or third-party processing timeframes.
“Business Day” means a day on which banks are open for business in Western Australia, excluding weekends and public holidays.
Further definitions will be included where required throughout these Terms and Conditions.
2.1 JK CANNING ELECTRICAL SERVICES may, at its discretion, issue a Quote to the Customer for the supply of goods and/or services. The Customer acknowledges that a Quote is an invitation to treat only and not an offer capable of immediate acceptance.
2.2 A binding contract is formed when the Customer does any of the following:
(a) instructs JK CANNING ELECTRICAL SERVICES (verbally, in writing, by SMS, email, purchase order or other electronic communication) to proceed with the Works; or
(b) accepts the Quote expressly or impliedly, including by conduct; or
(c) pays a deposit or allows JK CANNING ELECTRICAL SERVICES to attend site or commence preparation, procurement or scheduling.
2.3 JK CANNING ELECTRICAL SERVICES may refuse, suspend or cancel the supply of goods and/or services at its discretion where:
(a) the Customer is or is suspected to be insolvent;
(b) the site conditions are unsafe, non-compliant, not ready for the Works, or access is denied or obstructed;
(c) there is a risk to persons, property, or regulatory compliance; or
(d) materials become unavailable, discontinued or delayed by suppliers.
2.4 Where any goods specified in a Quote are unavailable at the time of supply, JK CANNING ELECTRICAL SERVICES may substitute a reasonable equivalent or higher specification product at its discretion.
2.5 These Terms and Conditions prevail over any Customer-issued purchase order terms, subcontractor agreements, head contract provisions, or customer-imposed conditions unless expressly agreed in writing by a duly authorised officer of JK CANNING ELECTRICAL SERVICES.
2.6 No terms or conditions expressed by the Customer in any document (including purchase orders, email confirmations, tender terms or other correspondence) are binding on JK CANNING ELECTRICAL SERVICES unless expressly accepted in writing by a duly authorised officer of JK CANNING ELECTRICAL SERVICES.
3.1 The Customer warrants that it has full power and authority to enter into this agreement and that no further authorisations, board resolutions, trust resolutions, third-party approvals or consents are required for this agreement to be binding.
3.2 Where the Customer is a trust, the trustee enters into this agreement in its own capacity and as trustee of the trust, and warrants that it has the lawful right of indemnity out of the assets of the trust and that its right of indemnity has not been limited in any way.
3.3 If the Customer is a company, the directors personally warrant that the company is solvent at the time of entering into this agreement and is able to pay its debts as and when they fall due.
3.4 These Terms and Conditions apply to the exclusion of any terms and conditions issued or asserted by the Customer, whether before or after the date of this agreement.
3.5 Acceptance of these Terms and Conditions is deemed to occur upon any instruction to proceed, supply of information, provision of site access, payment of any deposit, or any other conduct constituting reliance on JK CANNING ELECTRICAL SERVICES to commence or prepare for the Works.
3.6 No cooling-off period applies unless expressly required by legislation which cannot be contracted out of.
4.1 All prices are quoted on the basis of information, drawings, site conditions and specifications provided by the Customer at the time of quotation. JK CANNING ELECTRICAL SERVICES reserves the right to revise pricing where such information is later found to be incomplete, inaccurate, misleading or changed.
4.2 Quotes are valid for thirty (30) days from the date of issue unless otherwise stated in writing. If a Quote is accepted after the expiry period, JK CANNING ELECTRICAL SERVICES may, at its discretion, reprice the Works.
4.3 JK CANNING ELECTRICAL SERVICES may correct any error or omission in a Quote (whether typographical, arithmetical or otherwise) at any time, including after acceptance of the Quote by the Customer.
4.4 JK CANNING ELECTRICAL SERVICES may require a deposit as a condition of acceptance of any order. A deposit may be partly or wholly non‑refundable to the extent of costs already incurred, including but not limited to procurement, scheduling, administration, handling, design or restocking fees.
4.5 The Customer acknowledges that JK CANNING ELECTRICAL SERVICES is entitled to issue progress claims for Works performed and/or materials procured, whether or not the Works are complete, and irrespective of delays, staging or access restrictions beyond the control of JK CANNING ELECTRICAL SERVICES.
4.6 Where a Quote includes provisional sums, allowances or estimates, the Customer is liable for any increase in cost where actual quantities, scope or conditions differ from those assumed in the Quote.
4.7 JK CANNING ELECTRICAL SERVICES may suspend or cease Works if a variation is required and not yet approved or paid, or where the safety, compliance or scope of Works requires clarification or repricing.
4.8 The Customer may not cancel any order (in full or part) once accepted except in accordance with the cancellation provisions in these Terms and Conditions, and any cancellation may give rise to charges for costs already incurred.
5.1 Payment is due in accordance with the terms specified on the relevant invoice or Quote, unless separate written credit terms have been approved by JK CANNING ELECTRICAL SERVICES.
5.2 If no payment term is stated on the invoice, payment is deemed to be due immediately upon completion of the Works or upon delivery of the Goods (whichever occurs first).
5.3 JK CANNING ELECTRICAL SERVICES may, at its discretion, require payment in advance, on delivery, upon milestone completion, or by way of progress claims.
5.4 The Customer shall make payment by electronic transfer, cleared funds, or any other method approved by JK CANNING ELECTRICAL SERVICES. Payment is not deemed received until cleared in JK CANNING ELECTRICAL SERVICES’ nominated account.
5.5 The Customer is not entitled to set off, retain, withhold, deduct or otherwise delay payment for any reason, including (without limitation) alleged defects, cross-claims, counterclaims, or disputes, unless expressly required by law.
5.6 If the Customer fails to make payment when due, JK CANNING ELECTRICAL SERVICES may, without prejudice to any other rights:
(a) suspend or cease further Works;
(b) convert any outstanding invoices to immediately payable amounts;
(c) require cash-on-delivery for any further Goods or Services; and
(d) revoke any credit terms previously extended to the Customer.
5.7 The Customer acknowledges that time for payment is of the essence.
6.1 If the Customer fails to make any payment by the due date, JK CANNING ELECTRICAL SERVICES may charge default interest at the rate of nine percent (9%) per annum, calculated daily on the overdue balance from the due date until payment is received in full.
6.2 Any payment received from the Customer will be applied first to interest, administration and recovery costs, and thereafter to the principal amount owing.
6.3 In addition to interest, the Customer shall be liable for all reasonable administration, account management, reminder, handling and processing costs incurred as a consequence of late payment, non-payment or dishonoured payments.
6.4 The Customer shall also be liable for all legal, enforcement, mercantile agent and debt recovery costs (on a full indemnity / solicitor‑client basis) incurred by JK CANNING ELECTRICAL SERVICES in recovering any overdue amount, whether or not legal proceedings are commenced.
6.5 JK CANNING ELECTRICAL SERVICES may immediately suspend the performance of Works, withhold certificates, documentation or delivery of Goods, or cancel any outstanding orders where any amount remains unpaid.
6.6 The Customer acknowledges that the rights in this clause are a genuine pre-estimate of loss and not a penalty.
7.1 Title in all Goods supplied by JK CANNING ELECTRICAL SERVICES remains with JK CANNING ELECTRICAL SERVICES and does not pass to the Customer until all monies owing to JK CANNING ELECTRICAL SERVICES on any account whatsoever have been paid in full in cleared funds.
7.2 Risk in the Goods passes to the Customer immediately upon delivery to site, installation, or placement under the Customer’s control, whichever occurs first.
7.3 Until full payment is received, the Customer holds the Goods as bailee for JK CANNING ELECTRICAL SERVICES and must:
(a) keep the Goods in good condition;
(b) ensure the Goods remain properly stored, protected, and insured;
(c) not sell, dispose of, encumber or part with possession of the Goods; and
(d) not convert or mix the Goods with other property so as to alter their character.
7.4 If the Customer fails to pay any amount when due, or becomes insolvent, bankrupt, externally administered, or subject to any enforcement proceedings, JK CANNING ELECTRICAL SERVICES may, without notice, enter any premises where the Goods are located and retake possession of them, and the Customer irrevocably authorises such entry and indemnifies JK CANNING ELECTRICAL SERVICES against all liability arising from the exercise of this right.
7.5 Any payment made by or on behalf of the Customer that is later voided, reversed or set aside (whether under insolvency law or otherwise) shall be deemed not to discharge the Customer’s indebtedness, and title in the Goods shall be deemed never to have passed.
7.6 JK CANNING ELECTRICAL SERVICES is not liable for any loss or damage suffered by the Customer or any third party as a result of the exercise of its rights under this clause.
8.1 Any timeframe or date nominated by JK CANNING ELECTRICAL SERVICES for delivery or completion of Works is an estimate only and shall not be binding.
8.2 Delay, standby, interruption or rescheduling caused by other trades, lack of access, unsafe conditions, Customer instructions, supply delays or regulatory processes shall not give rise to any right of termination, compensation or withholding of payment.
8.3 JK CANNING ELECTRICAL SERVICES may charge stand‑down fees, return‑to‑site fees, waiting time, travel and labour costs occasioned by site inaccessibility, delays or non‑readiness of the work area.
8.4 JK CANNING ELECTRICAL SERVICES is not liable for delays arising from force majeure events, including but not limited to strikes, industrial action, extreme weather, shortages, transport delays, utility/regulatory delays or acts beyond its control.
9.1 A Variation occurs where the scope, design, quantities, materials, sequencing, regulatory requirements, standards compliance or site conditions differ from those on which the Quote was based.
9.2 Variations shall be payable at JK CANNING ELECTRICAL SERVICES’ prevailing rates and may require suspension of Works until approved.
9.3 Where an immediate safety or compliance issue is identified, the Customer authorises JK CANNING ELECTRICAL SERVICES to carry out minimum necessary make‑safe works and charge the reasonable cost of such works.
9.4 Latent conditions include (without limitation) hidden wiring faults, asbestos, mould, pest damage, restricted access, structural obstructions or prior non‑compliant work.
10.1 The Customer must inspect Goods and/or Works immediately upon delivery or completion and notify JK CANNING ELECTRICAL SERVICES in writing of any alleged defect, shortage or non‑conformity within fourteen (14) days.
10.2 Failure to notify within this period constitutes deemed acceptance.
10.3 The Customer must not dismantle, alter or interfere with Goods prior to inspection, failing which any claim may be rejected.
11.1 JK CANNING ELECTRICAL SERVICES may substitute comparable or reasonable alternative Goods where original items are unavailable, discontinued or delayed beyond reasonable supply timeframes.
12.1 JK CANNING ELECTRICAL SERVICES warrants its workmanship for twelve (12) months from completion, subject to exclusions in this clause.
12.2 Goods supplied carry the manufacturer’s warranty only.
12.3 Warranty is void where Goods are misused, altered, tampered with by others, damaged by external conditions, or not maintained.
12.4 Warranty claims for Goods must be notified within six (6) months of receipt and the Goods returned within twelve (12) months.
12.5 Uncollected warranty items left for more than thirty (30) days after notification may be disposed of at the Customer’s cost.
12.6 For EV chargers, load-control devices, home battery systems, or any other electrically intensive equipment, the Customer acknowledges and agrees that:
(a) Overall supply capacity (including Western Power supply constraints, main switchboard capacity, service protection devices and maximum demand limits) is determined by the existing installation, not by JK CANNING ELECTRICAL SERVICES;
(b) Any limitation in charging speed, load balancing, reduced charging rate, phase availability, or duty cycling due to insufficient supply capacity does not constitute a defect or warranty issue;
(c) Additional upgrades (including switchboard upgrades, mains upgrades, supply capacity increases, or Western Power approvals) may be required at additional cost and are outside the original scope unless expressly quoted;
(d) JK CANNING ELECTRICAL SERVICES is not liable for performance loss where the supply infrastructure cannot support the desired charging capacity; and
(e) Manufacturer warranties may be contingent on adequate site supply capacity, and any non-compliance caused by existing infrastructure is solely the Customer’s responsibility.
13.1 The Customer must provide safe, lawful and unobstructed access to the work area, including adequate lighting, power and clearance of obstructions.
13.2 The Customer is responsible for ensuring the site is ready for the Works and that other trades do not impede the performance of the Works. Any delay, interference, obstruction, or stand-down time caused by third parties shall be charged to the Customer.
13.3 JK CANNING ELECTRICAL SERVICES may lawfully disconnect, isolate or make-safe any hazardous, non-compliant or unsafe installation without prior consent where required to satisfy duty of care obligations.
13.4 The Customer indemnifies JK CANNING ELECTRICAL SERVICES for any loss, damage or liability arising from concealed, buried or hidden services, including gas, electrical, communication or data services, whether indicated or not.
13.5 Landscaping, paving, patching, painting and cosmetic finishes are excluded unless expressly stated in writing.
14.1 The Customer must ensure uninterrupted access to the work area on the agreed dates. Delays caused by other trades, incomplete works, site obstruction, locked premises, unsafe conditions, or non‑readiness of the work area constitute chargeable stand‑down time.
14.2 JK CANNING ELECTRICAL SERVICES may charge return‑to‑site fees, waiting time, travel time and labour costs where access is delayed or prevented for reasons outside its control.
14.3 Where work sequencing is impacted by the Customer, other trades, or uncoordinated site arrangements, JK CANNING ELECTRICAL SERVICES may reschedule works to the next available booking window without penalty.
14.4 If the Customer requests priority rescheduling or out‑of‑sequence return works, this may incur additional charges.
14.5 For builder or construction sites, any required attendance beyond the quoted allowance for coordination, variations, re‑attendance, staging or site logistics is chargeable at current rates.
14.1 JK CANNING ELECTRICAL SERVICES is not a security monitoring provider and does not retain, store, review or monitor CCTV or alarm footage on behalf of the Customer.
14.2 JK CANNING ELECTRICAL SERVICES is not responsible for recording uptime, footage availability, network connectivity, internet stability, or continuity of service of any installed security, CCTV, alarm, intercom or smart device.
14.3 System performance depends on the Customer’s NBN service, modem, Wi‑Fi strength, network hardware, ISP performance, antenna environment and other external factors beyond the control of JK CANNING ELECTRICAL SERVICES.
14.4 A system shall not be deemed faulty solely because of network interruptions, NBN outages, ISP throttling, low signal strength, power loss, router configuration changes, password changes or Customer‑side hardware failure.
14.5 Remote access, app‑based control and push notifications are provided on a best‑efforts basis only and are not guaranteed.
14.6 JK CANNING ELECTRICAL SERVICES shall not be liable for loss, theft, intrusion, damage or any consequential event alleged to have occurred during or due to a period where recording or remote access was impaired by network or internet conditions.
15.1 After acceptance, the Customer may not cancel an order without written consent and payment of incurred costs.
15.2 JK CANNING ELECTRICAL SERVICES may suspend or terminate Works and recover Goods upon insolvency, liquidation, external administration or similar event affecting the Customer.
16.1 These Terms constitute a security agreement under the PPSA and create a registrable security interest in all Goods.
16.2 JK CANNING ELECTRICAL SERVICES may register its interest on the PPSR without notice and the Customer waives all rights to receive PPSA notices to the extent permitted by law.
17.1 The Customer consents to JK CANNING ELECTRICAL SERVICES collecting, using and disclosing credit and personal information for credit assessment, account management, enforcement and recovery.
17.2 JK CANNING ELECTRICAL SERVICES may exchange information with credit reporting bodies, mercantile agents and other credit providers.
18.1 JK CANNING ELECTRICAL SERVICES is not liable for delay or failure to perform its obligations where beyond its reasonable control.
19.1 To the maximum extent permitted by law, JK CANNING ELECTRICAL SERVICES is not liable for indirect, consequential or economic loss.
20.1 All designs, documents and methodologies remain the property of JK CANNING ELECTRICAL SERVICES.
21.1 If asbestos, suspected asbestos‑containing material (ACM), mould, bio‑hazard, chemical contamination or any other hazardous or unsafe condition is identified or reasonably suspected, JK CANNING ELECTRICAL SERVICES will immediately cease work and the area will be treated as a stop‑work zone.
21.2 All costs associated with inspection, testing, clearance, removal, remediation, disposal, or specialist attendance are the responsibility of the Customer unless expressly included in the original Quote.
21.3 Delays arising from hazardous material discovery constitute a variation and may result in stand‑down charges, postponement of works or rescheduling to the next available booking window.
21.4 JK CANNING ELECTRICAL SERVICES is under no obligation to recommence works until the Customer provides written evidence of clearance by a qualified person.
22.1 Network‑dependent products (including but not limited to smart lighting, automation gateways, Wi‑Fi devices, app‑linked switches, intercoms, cameras, cloud controllers and smart meters) rely on the Customer’s internet and network infrastructure.
22.2 Service interruptions caused by ISP outages, router resets, password changes, firmware updates, modem replacement, Wi‑Fi drop‑out, network congestion or mobile carrier changes do not constitute a defect or warranty issue.
22.3 Reconfiguration, re‑pairing, network re‑commissioning or app re‑integration requested after completion is a billable service call.
23.1 JK CANNING ELECTRICAL SERVICES is not liable for any damage, displacement, disconnection, loosening, contamination or failure of Goods or Works caused after completion by other trades, contractors, painters, tilers, cabinetmakers, plasterers, roofers, cleaners or the Customer.
23.2 Any rectification works following third‑party interference are chargeable at current service rates.
23.3 Warranty is void where subsequent trades alter, disturb, conceal or otherwise interfere with installed Goods or cabling.
24.1 JK CANNING ELECTRICAL SERVICES may suspend or terminate the supply of Goods and/or Services immediately where the Customer:
(a) fails to pay any amount when due;
(b) obstructs, delays or refuses access to the worksite;
(c) issues instructions which would cause non‑compliance with law or safety standards; or
(d) becomes insolvent or is reasonably suspected to be unable to meet its obligations.
24.2 Upon termination, all amounts owing (including unbilled works to date) become immediately payable and JK CANNING ELECTRICAL SERVICES may recover Goods in accordance with the PPSA and Title provisions of these Terms.
25.1 A minimum call-out fee applies to all site attendances unless expressly waived in writing by JK CANNING ELECTRICAL SERVICES.
25.2 After-hours, weekend, public holiday or emergency attendance is charged at higher rates and may require upfront payment or pre-authorisation prior to dispatch.
25.3 Diagnostic time, investigation time, fault finding, testing, assessment of existing wiring, or advice given onsite is a billable service even where no repair is carried out.
25.4 Where no fault is found or the fault is attributable to Customer equipment, third-party products or network issues, the call-out remains payable in full.
25.5 Regulatory and certification processes (including but not limited to Western Power notifications, meter changeovers, supply upgrades, network protection approvals, and compliance submissions) are subject to third-party timeframes and do not delay completion or payment.
25.6 Handover is deemed to occur upon practical completion when the installation is operational and safe for use, regardless of administrative or authority processing delays.
25.7 Documentation (including certificates, manuals or user instructions) may be provided electronically after completion and any authority delay does not constitute incomplete works.
25.8 Any reattendance for training, network setup, app configuration or non-defect familiarisation is a billable service unless expressly included in the Quote.
26.1 The parties must attempt good‑faith resolution before commencing proceedings.
27.1 These Terms are governed by the laws of Western Australia.
27.2 Invalid terms are severed and the remainder continues.
27.3 JK CANNING ELECTRICAL SERVICES may assign its rights without consent.
*by appointment only